The CTE incorporates the carbon footprint: what changes with the new HSA 1 section

The draft Technical Building Code introduces a Global Warming Potential indicator. It is the Spanish transposition of the new European framework, and directly affects the choice of materials.

The draft of the new HSA 1 section of the CTE will require the declaration of the Global Warming Potential of the building in kg of CO₂ equivalent per square metre of useful area, in new construction and extensions. The calculation covers the modules of product (A1-A3), construction process (A4-A5), maintenance and replacement (B1, B2, B4), operational energy (B6) and end of life (C1-C4).

A technical detail with practical consequences: the regulations provide for a corrective factor depending on the quality of the data. If specific data from an Environmental Product Declaration is used, the calculation is more favourable than if generic database values are used. In other words, working with materials that have DAP not only improves transparency, but also refines the result of the regulatory calculation.

For material manufacturers, this reinforces the incentive to have verified DAPs. For engineering and construction companies, it means integrating the carbon calculation as one more verification of the project, along with the energy requirements that the CTE already contemplates.

How can we help you?

We guide you in sustainability and regulatory compliance so that your business grows with impact and safety.

[UPDATE]

Innovating in sustainable tourism with photovoltaic installations

June 9, 2023

Today we want to talk to you about the photovoltaic installations carried out in collaboration with Bypillow, a pioneering hotel chain in the Lowcost chic concept.

Envolta Global promotes new decarbonisation strategies for companies and administrations.

May 22, 2025

Our team of sustainability experts works alongside public and private organizations to design real and effective decarbonization solutions, always aligned with European policies and global challenges.

Implementation of ISO 14.001 and integral carbon footprint for MECESA

July 26, 2025

For MECESA, our proposal was to implement an environmental management system in accordance with the ISO 14.001 standard, accompanied by the calculation of the carbon footprint (scope 1, 2 and 3) to integrate sustainability into the daily operation.