Calculate the real carbon footprint of the building and justify your certification
Detailed Life Cycle Analysis of the closed executive project: foundations, structure, envelope, installations and finishes. The technical document you need for LEED, BREEAM or VERDE.
From the closed project to the justification report
A structured process so that the result is rigorous and directly usable for certification.
Documentary compilation
We gather the executive project, measurements and constructive report of the building already defined.
Inventory of materials
We quantify all materials and systems: structure, envelope, installations and finishes.
Complete ACV calculation
We apply the life cycle methodology from the manufacture of materials to the end of life.
Report to certify
We deliver the technical documentation in the format required by the chosen certification system.
The report adapts to your certification system
We prepare the calculation and documentation according to the requirements of each scheme.
LEED
Data support for credits of materials and resources that assess life cycle analysis.
BREEAM
Calculation of the impact to justify the environmental assessment criteria of the material and the building.
GREEN
Analysis aligned with the life cycle indicators required by the GBCe evaluation system.
A rigorous report, not a generic estimate
With the project closed, we calculate the real impact of the building based on definitive measurements, not approximations. This is the level of detail required by the certifying bodies.
I want to certify my building- Calculation on real measurements, not generic estimates
- Covers foundations, structure, envelope, installations and finishes
- Documentation directly usable by the certifying body
- Methodology aligned with LEED, BREEAM and VERDE
- Engineering and sustainability team with construction experience
- Accompaniment throughout the certification process
Closed project or design phase
We carry out the LCA of buildings at the time that fits your project.
Comparative study in the design phase
You compare different structural, façade or finish solutions while you still have a choice, before closing the project.
See this serviceDetailed calculation on closed project
We analyze the entire building already defined to obtain the final result and justify LEED, BREEAM or VERDE certifications.
Request this serviceCompanies and organizations
Before requesting the ACV
Do I need the executive project closed to make this LCA?
Yes, this modality works on real measurements of the final project. If you are still deciding between alternatives, you are more interested in comparative study in the design phase.
Is the report valid for any certification?
We adapt the calculation and format of the report to the system you need: LEED, BREEAM or VERDE, following the documentary requirements of each scheme.
What documentation do we need to provide?
Executive project, measurements and constructive report. If information is missing from any material or system, we tell you exactly what needs to be completed.
How long does the full calculation take?
It depends on the size of the building and the availability of documentation. We give you a specific deadline once the project has been reviewed.
Request the calculation of the LCA
Tell us about the building and the certification you are looking for, and we will propose the scope and deadline.
Septimania 57, bass · 08006 Barcelona
Or call us directly at 621 14 20 57